The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury) Local Development Order No 2 (2014) (LDO): Temporary limited capacity foam mixing plant with associated storage, crushing and screening for the purposes of recycling and rem
The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury Local Development Order No. 2 (2014) (LDO): Prior Notification of Development: Creation of access road to open south western development plot
The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury Local Development Order No. 2 (2014) (LDO): Prior Notification of Development: Extension of permission for temporary limited capacity foam mixing plant and ancillary works fr
The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury Local Development Order No. 2 (2014) (LDO): Prior Notification of Development. Temporary limited capacity foam mixing plant with associated storage, crushing and screening fo
Provision of a new external steel frame proposed at 3 no. levels, connected by an external steel staircase, to provide access to 7 no. new storage tanks, following the removal of the existing tanks and associated pumps.
Refurbishment of existing office building (class B1) to include rooftop plant extension, external stair, external and internal refurbishment, new external security arrangements (fence, gates, kiosk) with associated landscaping, parking reconfiguration. Rem
The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury) Local Development Order No 2 (2014) (LDO): Proposed Temporary Coal Tar Recycling Plant
The Lancashire Advanced Engineering and Manufacturing Enterprise Zone (Samlesbury) Local Development Order No 2 (2014) (LDO): Earthworks and Drainage (northern plots)
Earthworks and drainage to the area south east of the EZ spine road (Sir Frederick Page Way) in order to create level development platforms for future plots as part of the development of the Enterprise Zone
Outline application for the expansion of existing aerospace manufacturing and engineering facility to include additional industrial (57,844 sq m) and office space (39,048 sq m) with associated access, car parking, surface water attenuation works and ancill